April 11 Construction Update

  • 20170411_070841
  • 20170411_070915
  • 20170411_071016
  • 20170411_071141
  • 20170411_091834
  • 20170411_091847
  • 20170411_092100

Sully-Miller will do:

  • Sidewalk concrete.
  • Sidewalk and C&G compaction.

IMPORTANT NOTE: Please pay close attention for deviations in delineation of the traffic control. Obey flagmen as noted in the above-stated area as it will change on a daily basis during the week. Speed limits will remain lowered at 30 mph and is strictly enforced. Tickets are doubled in construction zones. A detour to Sheila on the south is highly suggested from Fidelia Ave to Eastern Ave. This work is only tentative and can change on a very short notice the day of the work.

Disclaimer: All work is tentative and should be verified prior to use.