April 3 Construction Update

  • 20170403_070717
  • 20170403_070747
  • 20170403_070847
  • 20170403_071542
  • 20170403_073639
  • 20170403_074650

Sully-Miller will do:

  • Bus pad concrete.
  • Lateral C-1 Installation.
  • Trench and install conduit.
  • Roadway subgrade, driveway, bus pad, & base compaction.

IMPORTANT NOTE: Please pay close attention for deviations in delineation of the traffic control. Obey flagmen as noted in the above-stated area as it will change on a daily basis during the week. Speed limits will remain lowered at 30 mph and is strictly enforced. Tickets are doubled in construction zones. A detour to Sheila on the south is highly suggested from Fidelia Ave to Eastern Ave. This work is only tentative and can change on a very short notice the day of the work.

Disclaimer: All work is tentative and should be verified prior to use.

For questions, information and updates:
Visit project website: www.washingtonblvdcommerce.com
E-mail: info@washingtonblvdcommerce.com
Call Project Hot Line: (888) 705-4009 (toll free)

Comments are closed.