March 7 Construction Update

  • 20170307_072808
  • 20170307_072830
  • 20170307_090552
  • 20170307_090705
  • 20170307_090735

Sully-Miller will do:

  • Mainline B installation.
  • LCB form inspection.
  • Curb and gutter concrete
  • Conduit Crossing.

IMPORTANT NOTE: Please pay close attention for deviations in delineation of the traffic control. Obey flagmen as noted in the above-stated area as it will change on a daily basis during the week. Speed limits will remain lowered at 30 mph and is strictly enforced. Tickets are doubled in construction zones. A detour to Sheila on the south is highly suggested from Fidelia Ave to Eastern Ave. This work is only tentative and can change on a very short notice the day of the work.

Disclaimer: All work is tentative and should be verified prior to use.